Reference jobs 1996
- MEVA Roudnice - delivery and mounting of hot-water boiler Viessman 3x 1,4 MW, 1x 0,7 MW burners Weishaupt, pipelines, gas inlet, building part, control system
- AGRITEC Šumperk s.r.o. - delivery and mounting of gas boiler-room 1x VSP1 1x VVP 1000
- MORPA Olšany a.s. - mounting of new gas boiler-room, boiler 2x BK 6,5 CHwater works, Twater works
Reference jobs 1997
- GLAVERBEL Dubí - delivery and mounting BK 4, water works, control system, BOsB Spirax Sarco
Reference jobs 1998
Reference jobs 1999
- PRÁDELNA Česká Lípa - production, delivery and mounting of mobile power plant 4t/h - boiler with burner APH 45
Reference jobs 2000
- ASAVET Biřkov - delivery and mounting of mobile power plant OKP 16, upgrade of steam pipelines, reconstruction water works for whole area, mounting BOsB to boiler 16t/h
- MLÉKO Telč - delivery and mounting of boiler BK 2,5 vč. gas inlet, water works, delivery of boiler 1,6t/h with burner APH 16, BOsB for boilers BK 2,5 and BK 1,6t/h
- KERAMICKÉ Závody Znojmo - delivery and mounting of boiler BK 4, burner APH including project
Reference jobs 2001
- Brewery Pardubice - delivery and mounting of boiler BK6 and BK8, burners Weishaupt, control system, water works, acid decarbonisation, BOsB Spirax
Reference jobs 2002
Reference jobs 2003
- IVG Colbachini Krnov - final delivery of steam boiler-room technology 2x2t/h including water works and BOsB
- ENERGETIKA Chropyně, a.s. - final delivery of steam boiler-room technology including complete project - mounting of boiler OKP 25 ( 3,8 MPa, 440st.C ), control system, water works, mounting of steam pipiline
- HAMÉ a.s.Babice - mounting steam boilers Danstocker TDC 9 and reconstruction of boiler BK 12 with burners Weisshaupt including economisers
Reference jobs 2004
- ICN Czech Republic a.s. - mobile power supply 2,5 t/h
- STAROPRAMEN BRANÍK - boiler-room 8t/h, EKO
- KLIMO s.r.o. MNICHOVO HRADIŠTĚ - delivery of boiler BK 2,5 t/h
- AVON RUDNÍK - delivery and mounting of steam acumulator
- GFE PŘEDMĚŘICE NAD LABEM - feed tank, deaeration
- SEVAPHARMA a.s. PRAHA - exchange of boiler pipes LOOS 10 t/h
- IVAX PHARMACEUTICALS s.r.o. OPAVA - delivery and mounting of boiler 25 t/h, 1,4 MPa, 250 °C, combo burner Saacke DDZG 10 ZP/TTO, delivery two blocks of economisers, including project
- LÁZNĚ Luhačovice - final delivery boiler-room BK 6,5 + BK 8, including steam superheatrs, economiser, BOsB control system, I&C
- MILTRA s.r.o., Městečko Trnávka - new steam boiler-room - boilers THS 40 - 2 x 4 t/h, burners Weishaupt, BOsB, water works, including pipelines
Reference jobs 2005
- Bivoj a.s., Opava - delivery and mounting of new steam boiler SBK 4 with steam superheater, delivery and mounting of repair burner Saacke SKVJG 40 for burning TTO, delivery and mounting of new water works station, delivery and mounting mechanism for automatic running of water works, BOsB ERAB for SBK 4 P and OKP 8 including boiler-room
- ASAVET s.r.o. Biřkov - delivery and mounting of boiler SKP 20 - 20 t/h; 1,8 Mpa, mounting system of pressure condensation returning
- Fruta Podivín a.s. - mounting economisers to boilers BK8 and BK6
- Linea Nivnice a.s. - excgange pipe of boiler BK 8, delivery and mounting new gas burners APH M - 90 PZ for 2x biler BK 8, BOsB ERAB for 2x BK 8 including boiler-room
- STYROTRADE Čakovičky - delivery and mounting two steam acumulators, delivery and mounting of steam boiler SBK 4 including economiser, burneru APH 45, BOSB Spirax Sarco
- ŽPSV Uherský Ostroh - delivery a mounting 2 ks burnerů APH 90 na of boiler BK 8, výroba a mounting 2 ks ekonomizérů na of boiler BK 8 a BK 6, přetrubkování of boiler BK 4
Reference jobs 2006
- Pivovar Staropramen – Praha Smíchov – delivery and mounting the BK 12 boiler according general repair, economizer, the burner Saacke, BOsB Spirax Sarco
Reference jobs 2007
- Chemopetrol Litvínov – dodávka vysokotlakého parního kotle SKP 7, 7 t/h, 69 bar, 450 °C, hořák Saacke – subdodávka pro fy. Ohnůt Zlín
- Heat supply Adamov s.r.o. - delivery and installation of the boiler BK 8.
- Heat supply Adamov, s.r.o. – supply of the steam boiler BK12 including accessories.
- Zeveta Bojkovice – delivery and installation of the new coal ecologically boiler SKR 10t/h in in membrane design, reconstruction and ecologization of the boiler RK 8t/h.
- IVAX_opava - overhaul of the steam boiler BK8 and installation of the steam superheater to the second flue draft, replacement of the boiler economiser OKP 16.
Reference jobs 2008
- Energetika Strážské – Slovensko – general delivery of the high pressure steam boiler SKR 22, 22t/h, 65bar, 450oC – 5 fuel types – coal, wood chips, liquid fuels, natural gas including delivery of the building, M+R, EMI, piping and coal handling.
- DIAMO s.p., Dolní Rožínka – delivery and installation of the boiler SKP 16, 16t/h, 14bar, 280oC, 2 blocks of the economizers, gas burner, connection for distribution, project documentation.
- HELUZ Hevlín, v.o.s. – delivery of the boiler 2t/h, the boiler SBK 2, ekonomizer, feed water tank, water heater, delivery of the chemical water treatment.
- FRUTA a.s. Podivín – delivery and installation of the boiler BK 6, the burner APH M 45 PZI and ekonomizer.
Reference jobs 2009
Reference jobs 2010
- Fruta Podivín – delivery of the boiler SBK 8, the burner APH 90 PZ, the ribbed ekonomiser.
- DIAMO, o.z. Geam, Dolní Rožínka – delivery of the boiler 5t/h, the boiler SBK 2,5, economisers, the burners APH 25, BOSB Spirax Sarco, control station, chemical water treatment, heat water treatment.
- Cutisin Jilemnice – boiler room extension – delivery of the steam boiler SBK 8, ekonomiser, the burner APH 90, BOSB, control station, water treatment, regulation station of the gas, pipelines distribution.
- Bachl Ronneburg – SRN – assembly for the accumulator.
- Hospital Tábor - treatment of the equipment for the thermal water treatment.
- Kofola Mnichovo Hradiště – repair of the boiler BK 2,5.