Reference jobs 1992
- PBH Vsetín s.p. - sequence change of gas-boilers OKP 25, 2x OKP 16
- TON Bystřice pod Hostýnem s.p. - general repair of boiler K1 20 tp/h including fire grate
- TON Holešov s.p. - change of convective parts of boiler 20 tp/h, hot-air tower, feedwater heater, steam superheater, exchange of de-ashing by 2 boilers ČKD 8 t/h
Reference jobs 1993
- CUKROVAR Trenčianská Teplá a.s.- reneral repair of gas-boiler 50 tp/h - burners SAACKE
- ŽĎAS Žďár nad Sázavou a.s. - fumigation of coal-boiler 40 t/h, repair of boiler 65 t/h, mounting of new boiler OKP 25 for heating industry purposes including CHÚV - burner SAACKE
- AGROSTROJ Prostějov a.s. - mounting of new gas boiler-room 3x BK 10 a 2x BK 6,5
- KOVOHUTĚ Břidličná a.s. - new boiler BK 10 with burner SAACKE
- NEMOCNICE Uh.Hradiště - fumigation of mazut-boiler OKP 8 and a new boiler BK 10 with burner APH 90
- DP Praha - Řepy a.s. - exchange of pressure part OKP 8 H
- PRAŽSKÁ Teplárenská a.s. - reconstruction of two oil-boilers OK 10 and mounting of boiler BK 10 with burner WEISHAUPT including a new CHÚV
Reference jobs 1994
- AUTOPAL Rychvald a.s. - mounting of boiler-room BK 4 a OKP 16 including reg. station of gas
- ELEKTRÁRNA Kolín a.s. - unmounting of two coal-boilers 35 t/h, mounting of a new gas-boiler K 75 t/h
- KRAS Boskovice a.s. - delivery of boiler BK 4
- MORAVIA Hlubočky s.p. - general repair of boiler R 10H including fire grate
- MASSAG a.s. Bílovec - building of boiler-room including water works and hot-water pipes [3 500 m] 1x 7,1 MW/h; 2x 4,5 MW/h
- ZPS a.s.Energetika Zlín - dust exhaust of flue gases two boilers R 10H - fabric filters ZEOS - , delivery of gas boiler BK 10H, burner SAACKE
- ODETKA - Vrbno pod Pradědem - building of gas boiler-room 2x 2,5 t/h including TÚV and CHÚV control station of gas of boiler SLATINA VSP
- UNEX Uničov - delivery and mounting of boiler HBK 6,5 t/h. Reconstruction of boiler-room from steam to hot-water, BOsB ERAB, reconstruction of boiler OKP 16 for hot-water operation
Reference jobs 1995
- PRABOS Slavičín a.s. - flumigation of boiler-room, mounting of additional hot-air tower to boiler BK 4
- FATRA a.s. Napajedla - modification of aluminium tanks, mounting of colling down basin, pipings, connector to machines of central heating
- EZA Šumperk - mounting of boiler BK 6, new technology of boiler-room
- JITEX Písek - complete mounting of fittings up takes, feedwater heater and hot-air tower
- VOP Šternberk - exchange of convective bundles and back site wall of boiler R 10
- OLPA Jindřichov - mounting of boiler BK 10 including gas inlet
- ŽELEZÁRNY Králův Dvůr - mounting of boiler OKP 25
- MLÉKÁRNA Česká Lípa - unmounting of coal-boiler R 16, mounting of a new gas-boiler OKP 12
- SUMTEX s.r.o.Šumperk - building of a new gas boiler-room with boilers VSP 1 a VSP 4 including complete water service
Reference jobs 1996
- SÍDLIŠTĚ Mír Slavičín - reconstruction of hot-water boiler-room 2x KDVE 25
- VIAL Zlín-Malenovice - provisional gas boiler-room VSP 4
- OPTIMIT Odry - exchange of steam-overheating and economiser on boiler 20 t/h
- ZÁSOBOVÁNÍ Vsetín - repair of pipes distribution
- TOFA Tlumačov a.s. - mounting of a new gas boiler-room VSP 1,6 + gas inlet
- UHERSKÝ Brod - repair of pressure system and fire grate of boiler RK 10
- HEDVA Rýmařov a.s. - a new gas inlet and mounting of mobile heating plant GENERÁTOR, delivery and mounting of gas boiler-room2x BK 6,5
- MEVA Roudnice - delivery and mounting of hot-water boiler-room Viessman 3x 1,4 MW , 1x 0,7 MW , hořáky Weishaupt kogenerační jednotka GEB 160 CHÚV rekonstrukce vytápění, rozvody, plynová přípojka, stavební část, řídící systém
- AGRITEC Šumperk s.r.o. - delivery and mounting of gas boiler-room 1x VSP1 + 1x VVP 1000
- MORPA Olšany a.s. - mounting a new gas boiler-room with boiler 2x BK 6,5 , CHÚV, TÚV
- RAAB Karcher Zlín - Malenovice - hot-water inlet
- KRYTINA Hranice - local heating, heating reconstruction
- ARIES Teplice - flumigation of boiler BK 6
Reference jobs 1997
- GLAVERBEL Dubí - delivery and mounting of boiler BK 4, ÚV, ŘS, BOsB Spirax Sarco
- TEPLÁRNA Jaroměř - general repair of pressure part and linnings of boiler 35 t / h
- TYLEX Letovice a.s. - repair of fire grate and ecologiration of boiler R 16
- MLÉKÁRNA Mor.Budějovice - delivery and mounting of steam-boiler BK 6
- CUTISIN Kořenov - drinking water works
- ZETOR Havlíčkův Brod - general repair of boiler VSP 1.6
- ČEZ Teplárna Náchod - flumigation of boiler OKP 16, Weishaupt, control system
- MEZ Nedvědice - flumigation of coal-boiler 5,8MW, gas regulation station, gas inlet
- TEPLO Bruntál - reconstruction of boiler R10 to fluidises combustion
- NEMOCNICE s pol. Nový Jičín - pipes exchange of pressure complex BK 8
- VELVETA Varnsdorf - ekologization of boiler 2x 35 t/h, control system, 4x gas-burner Weishaupt G70
- NOVÁ HUŤ Zábřeh - flumigation of boiler-room 2x VSP 4, 1x VSK 4, Autoflame, monitoring system
- MORPA Vlčice - reconstruction of mazut boiler-room, 2x VSK 4, burners Weishaupt
- TEXTONIA Červený Kostelec - mobile heating plant 6t/hod
- KERAMICKÉ závody Podbořany - control system of hot-water boiler-room
- PRŮMYSLOVESTA a.s. - dripping measuring in drip oil
- AMT Čeňkov - delivery of boiler BK 2,5, smoke extenders, pipes distribution, fittings
- BEFACOAL Dobříš - ekologization of coal grating boiler 10 t / h
- NEMOCNICE Kostelec nad Černými lesy - reconstruction of boiler-room, UV, BOsB Spirax Sarco, exchange from burners Třebíč to burners Weishapt to LTO - 2 x BK 6 and 1 x BK 4
Reference jobs 1998
- LIHOVAR Radkovice - a new gas boiler-room VSP1.6
- BAREVNA Bi Textil Podivín - instalation of boiler CERTUS 0,85t/h, including gas inlet with cutoff and I&C, water works partial reconstruction
- SFINX Holešov - general reconstruction of boiler O 10 vč. BOsB SPIRAX-SARCO, periodical blow down, continual blow down
- GOLGOT Nymburk - gas boiler-room building with VSP 1600, gas inlet,BOsB including periodical blow down, TUV, CHUV
- ASAVET Biřkov - repair of steam distribution, water pre-treatment and water works reconstruction for whole factory
- LUPRA Luhačovice - pipes exchange of boiler BK 8
- TEPLO Bruntál - repair of three coal-boilers ČKD 8 t/h to fluidises combustion
- TON Bystřice pod Hostýnem - general repair to boiler ČKD 20 t/h
- VIGONA Svitavy - exchange of condensate tank 10 m3
- MITAS a.s. Praha - reconstruction of recovery machinery
- KORYNA Nábytek a.s. Koryčany - instalation of older boiler OKP 8, and reconstruction from steam to hot-water, Saacke burner instalationin
- CUTISIN Jilemnice - boiler-room reconstruction, boiler exchange to 3x BK 8, reconstruction UV, ŘS, BOsB SxS
- GLAVERBEL Teplice - automatic UV building
- ENASPOL Ústí nad Labem - instalation of steam brum for chemical incinerator, BOsB Spirax Sarco
- NEMOCNICE Benešov - ungutter pipeline steam distribution, hot-water distribution, TUV, II. part of area reconstruction
- ŠKO-ENERGO Mladá Boleslav - 4MW heat back-up power supply, zapůjčení, lending, mounting
- HMZ a.s. Bruntál - BOsB Spirax Sarco to VSP 4, VSP 6,5 - including automatic periodical blow down, exchange of burner APH M 45 PZ
- LIHOVAR Merklín - mounting of boiler 3 t/h, BOsB Spirax Sarco
- PRAGOCHEMA Praha - delivery of boiler BK 1,6 t/h
- MLÉKÁRNA Jihlava - delivery of boiler BK 8
Reference jobs 1999
- VELVETA a.s. Varnsdorf - pressure system exchange and flumigation of boiler OKP 12 - mobile heating plant
- BEFACOAL Dobříš - ekologization of coal-boiler 10t/h, 16t/h, SPIRAX-SARCO steam measuration
- ŠKO-ENERGO Ml. Boleslav - 4MW heat back-up power supply, lending, mounting, operation
- TON Holešov - exchange, mounting and setting in operation 2x burner SAACKE
- AUTOPAL Hluk - delivery, mounting and setting in operation 4x burner Weishaupt
- DŮL FRANTIŠEK - Horní Suchá - mounting and setting in operation 2x3 burners APH 45 with combinated operation to ZP and DP, boilers 2x16t/h
- PRÁDELNA Česká Lípa - production, delivery and mounting mobile power plant, delivery and mounting of mobile boiler-room 4t/h - boiler with burner APH 45
- HAMÉ Babice a.s. - a new gas boiler-room building with boiler OKP 25
- PIKA Bzenec - general repair of boiler EMO CELJE 4 t/h
- TROPICANA Drinks Žatec - dodávka a montáž kotle BK 4
- PIVOVAR Svitavy - CHÚV + jumb feed control ERAB
- MLÉKÁRNA Mor. Budějovice - delivery and instalation of boiler BGT 6,5, economiser instalation, TÚV
- GALENA Opava - delivery and instalation of boiler OKP 16, burner SAACKE SG 150, EKO, automatic CHÚV, control system, 2x reduction steam station
Reference jobs 2000
- NAREX Praha a.s. - area flumigation - warming-up TUV, complex hot-water delivery, 2x 940 kW, boilers TH Ratíškovice,burners WEISHAUPT
- PIKA Bzenec s.r.o. - a new gas boiler-room 1x VSP 4, operation of boiler-room is out of lasting inspection
- HAMÉ Babice a.s. - delivery and mounting of repair gas boiler BK 6 with steam superheating, boiler-room control system – kaskáda cascade of gas boilers BK 6 and OKP 25
- ASAVET Biřkov - delivery and mounting of mobile power plant OKP 16, steam pipelines modification, reconstruction of water pre-treatment room and water works for whole factory, mounting BOsB to boiler 16t/h
- ŽOS České Velenice - ecologization of boiler 12t/h s mobile fire grate
- LIHOVAR Vyšehněvice - delivery and mounting of boiler BK 1t/h + burner + fittings up take
- PRECIOSA Turnov - 1xBOsB SxS, automatic water works
- CIHELNA Dolní Bukovsko - 2x BOsB Spirax Sarco to boilers VSP 2,5t/h, flumigation of boilers VSP 2,5t/h with burnersAPH
- JITONA Soběslav - flumigation and BOsB of boiler VSP 4t/h + delivery of boiler BK 2,5t/h + inlet ZP
- JITONA Prachatice - flumigation and BOsB of boiler VSP 4t/h + delivery of boiler BK 2,5t/h + inlet ZP, ÚV
- ASAVET Biřkov - waste-heat recovery, condensate management
- CUTISIN Kořenov - reconstruction of water warming-down, a new cooling plants, water filtering
- MEVA Roudnice - factory Bezděkov delivery of boiler 1,4 MW + burner Weishaupt
- MLÉKO Telč - delivery and mounting of boiler BK 2,5 including gas inlet, ÚV, delivery of boiler 1,6t/h with burner APH 16, BOsB for boilers BK 2,5 and BK 1,6t/h
- DIAMO Dolní Rožínka - delivery and mounting of control system, continual control emission and automatics with independent servomotors with electronic control of the proportion of burning for 4 burners on boiler 25 tp/h
- TEPLÁRNA Jaroměř - boiler BK 6t/h with burner APH 45 PZ, BOsB Spirax Sarco
- LIHOVAR Chrudim - BOsB on boilers 2x BK 10t/h and 1x BK6t/h + continual feed control
- TEPLÁRNA Kyjov - flue gasses boiler 4,4 t/h outside of melter
- CIHELNA Libochovice - steam boiler-room 1t/h including ÚV, BOsB, ÚT factory reconstruction
- PERLA Zábřeh - delivery and mounting of boiler BK 4, BK 1,6 burners APH, gas inlet, control station, ÚV, BOsB Spirax-Sarco
- MITAS Praha a.s. - delivery and mounting mechanical part of a new hot-water station
- PNEU Vraník, Slušovice - mounting of steam boiler BK1, delivery and mounting of burner WEISHAUPT to burning LTO, instalation BOsB ERAB including comlex project
- KERAMICKÉ Závody Znojmo - delivery and mounting of boiler BK 4, burner APH including project
- OCEL PROFIL Staré Město - delivery and mounting cooling circuit of production line steel section including project
- HEDVA Rýmařov - instalation of steam boiler 1t/h including project
- MORAVSKÉ Teplárny Zlín - exchange of condensate pipeline (600m, DN 150) in warmwater channel
- BARUM CONTINENTAL Otrokovice - delivery and mounting of condensate economy including I&C and project
- SEMPERFLEX OPTIMIT Odry - pressure complex repair of boiler 20t, instalation 4x junction exchange stations
- PIVOVAR Pardubice - delivery and mounting of boiler BK 6 and BK 8 including ECO, burners Weishaupt, control system, TÚV + CHÚV - acid decarbonization, BOsB SPIRAX
- NEMOCNICE Nový Jičín - general repair of steam boiler BK 8
- DARTA Uherský Brod - delivery and mounting of hot-water boiler 400kW
- UNEX Uničov - exchange control system of burner with electric control burning, switch on to existing ŘS including repair burning by actual burn, I. part of mounting new control system, boiler 16 tp/h
- CIHELNA Hevlín - reconstruction CHÚV and TÚV, BOsB
- POLNOHOS. DRUŽ. Bratislava - reconstruction from steam boiler BK6 to hot-water boiler
- NEMOCNICE Kostelec nad Černými Lesy - reconstruction of boiler-room
- ENASPOL Velvěty - mounting of steam drum for chemical incinerator
- PRÁDELNA Česká Lípa - production, delivery and mounting of mobilepower plant BK 4
Copyright © 1992 - 2011, SEACZ, a.s., All rights reserved