Reference jobs 2006
- Styrotrade Čakovičky – delivery and mounting the boiler room 10 t/h, the SBK 8 and BK 2 boiler, BOSB Spirax Sarco, TUV, CHUV – reversing osmose, control system, delivery central mechanical filtration of service water. The steam accumulators 9 m3, steam pipe-line connecting, the control system gases and gas distribution
- Pivovar Staropramen – Praha Smíchov – delivery and mounting the BK 12 boiler according general repair, economizer, the burner Saacke, BOsB Spirax Sarco
- Transelco Vrdy – general repair of heat-water boiler 1,7 MW
- Severofrukt Trávčice – general repair 2 pcs of the VSP 2500 boilers
- Cihelna Libochovice – CHUV for boiler room, CHUV for technology, 2 pcs AT stations, pipe-line distribution
- AVON Rudník – central UV for whole factory, UV for boiler room, AT stations, pipe-line distribution, control system
- Preciosa Turnov – adjustment of heat-water boiler room, aquitherm regulation
- Cutisin Jilemnice – steam and condensation distribution for technological line, stainless distribution, blows of line-head
- SECO Group Jičín – BOsB Spirax Sarco for 2 pcs hot-water boilers á 7,0 MW and hot-water system
- Fakultní nemocnice Hradec Králové – general repair of economizer for the boiler 4 t/h, repair TUV, repair VS
- ASAVET Biřkov – oil measuring in the returning condensation, stainless condensate basin
- GAS-PRESS Prachatice – parts for the general repair boilers 11,6 MW – delivery of conventional tie, chambers
- Golgot nymburk – repair of steam pipe-lines, delivery and mounting stainless pipe-lines of condensation
- HELIOR TRADE s.r.o. Praha – repair of the transported OKP 12 heating plant in Oslavany, pipe-line distribution
- SMS CZ Rokycany – delivery of hot-water exchanger incl. economizer for the Jihlava incineration – G.D. Metrostav Praha, pressure compensator, delivery of divider and interceptor, delivery of fire-tube exchanger
- Veba Olivětín – repair of recuperative exchanger
- Viessmann s.r.o. Rudná u Prahy – delivery of TUV machinery for the TELLO Šumperk company
- DAST s.r.o. Praha – Hotel Oceán Praha – the transformation of hot-water boiler room 2,0 MW, new control system, delivery and mounting instrumentation and control
- EASTERN SUGAR a.s. Hrochův Týnec – repair of boiler superheater 65 t/h 38 bar 450°
- ZZN a.s. Mělník – upgrade BOsB Gestra for the BAY boiler 1 t/h
- MTH Benešov – delivery and mounting of feeding basin 16 m3. Delivery degasser r. 1000 – mounting + dismounting current basin and degasser
- Dřevařský závod Karancskeszi – Maďarsko – transformation the hot-water boiler 0,5 MW onto chip wood burning onto steam low-pressure, UV, distribution
- MTH Kolín, boiler room Kostelec n/Č.L. – transformation the BK 4 steam boiler onto hot-water, control system, instrumentation and control, hot-water heating of TTO accumulators
- SATT Žďár n/S – CHUV, chemicals dispenser
- Sklárny Světlá n/S – the transformation of the 2 pcs OKP 25 steam boilers onto the OKP-25-H hot-water boiler, delivery the BK 8 hot-water boiler
- Baucomex Praha – delivery of noise suppressor
- Josef Novák, Slovensko – delivery of the boiler pressure part 1,5 MW onto the burning straw
- WAB Pharma a.s. Roztoky u Prahy – the manufacture and the exchange of superheater the BAY boiler
- Plzeňské pivovary, závod Pivovar Popovice – delivery of the filter emollient 1000mm in stainless design, dismounting of the current filter 1400 and mounting a new filter. The replacement of the boiler superheater OKP 25 VTML Mariánské Lázně – incl. manufacture
- KM BETA, a.s. – Závod Bzenec – Přívoz - The decentralization warming , back bone gas distribution and installation local source, the boiler room TPV 200 kW, the gas radiant panels and the gas air-heating set „LARSEN“
- CTZ, s.r.o., Uherské Hradiště - The delivery and the replacement of entire pressure complex coaly steam boiler RK4
- BONATRANS, a.s., Bohumín - The reconstruction of heating and TUV, development of central warm-water boiler room with the boilers LOOS 3 x 2,7 MW for the fuels earth gas and firedamp DEGAZ. Delivery and installation of the waste-heat boiler 2,2 MW for heat utilization from the rotary hearth furnace.
- AGRIS spol. s r.o., Medlov - The delivery of the chemical water works 15m2 / hour – the acid decarbonization incl. delivery of constructional part
- RACIOLA – JEHLIČKA s.r.o., Uherský Brod - The installation of the heat and chemical water-works for current steam gas boiler room in the part of factory called „Slaughter“ incl. installation the facilities BOsB ERAB. Development of the new steam gas boiler room with the boiler output 1,6t/hour incl. subterraneous gas-fixture and no canal steam distribution.
- Pivovar Janáček, a.s., Uherský Brod - The delivery and mounting of preheating finished water for the steam boiler room.
- OEZ s.r.o., Letohrad - The delivery and mounting of the chemical water-works for the steam boiler room.
- Energetika Chropyně, a.s. - Mounting of the outdoor distribution heating water
- GUMOTEX a.s., Břeclav - The reconstruction of the 2 pcs burners SAACKE, extension the elctronic proportion of fuel/air – Etamatic, installation of the new regulation gas lines, new electrical set of the 2 pcs boilers OKP 16, delivery and installation the steam reduction station for de-gassing, delivery and installation components of instrumentation and control – metering of steam for the 4 pcs boilers, metering condensation, metering additional water.