- Energetika Strážské – Slovensko – general delivery of the high pressure steam boiler SKR 22, 22t/h, 65bar, 450oC – 5 fuel types – coal, wood chips, liquid fuels, natural gas including delivery of the building, M+R, EMI, piping and coal handling.
- DIAMO s.p., Dolní Rožínka – delivery and installation of the boiler SKP 16, 16t/h, 14bar, 280oC, 2 blocks of the economizers, gas burner, connection for distribution, project documentation.
- HELUZ Hevlín, v.o.s. – delivery of the boiler 2t/h, the boiler SBK 2, ekonomizer, feed water tank, water heater, delivery of the chemical water treatment.
- AFOTEK s.r.o., Humpolec – delivery and installation of the hot water boiler with the boiler Viessmann in COLOR PROFI Boskovice company.
- KOFOLA a.s. Minichovo Hradiště – general repair and installation of 2 pieces of the boilers BK 2,5, ekonomizer, general delivery and installation of the steam boiler technology, chemical water treatment, thermal water treatment, feed water tank and supply of natural gas.
- FRUTA a.s. Podivín – delivery and installation of the boiler BK 6, the burner APH M 45 PZI and ekonomizer.
- JINDŘICHOHRADECKÉ MÍSTNÍ DRÁHY a.s. Jindřichův Hradec – general repair of the steam boiler of the locomotive U37.002.
- FIBERTEX a.s. Svitavy – general repair of the boiler BK 8, production and installation of ekonomizer, replacement of the burner APH M 45 PZ.
- HOSPITAL TÁBOR a.s. Tábor – adaptation and interconnection of all thermal station in hospitals building including develop of the detailed project documentation.
- CUKROVARY A LIHOVARY TTD a.s. Dobrovice – delivery and installation of equipment for biogas combustion in the boiler 25 t / h, general repair of the steam superheater boiler 25 t/h.
- JISTROP s.r.o. Dolní Bukovsko – delivery and installation of the gas heating in the production halls with units ROBUR.
- KOMTERM a.s. Praha - manufacture and delivery of the steams air heater SOVZ 240.
- MEVA Roudnice nad labem – installation of reservoir of the thermal water treatment plant with using of waste heat compressors.
- Cutisin Jilemnice – total general repair of 2 pieces of the boilers BK8 – K3 and K4.
- AFOTEK s.r.o. Humpolec – delivery and installation of the hot water boiler with a Viessmann boilers in the company WEZI-TEC Legnica, Poland.
- Pivovar Janáček – Uherský Brod - reconstruction of the distribution of heat in the whole area, boiler repairs – delivery of the new boiler SBK 2.5, reconstruction of the water treatment, delivery of the ekonomizer of the existing boiler.
- Spirax Sarco Praha – delivery of expanders and feed water tanks, delivery of the steam separators.
- Spirax Sarco S.A.S, Chatellerault, Francie – delivery of steams separators.
- Cukrovar České Meziříčí – refurbish and installation of the burner Huerbel, Belgium including new automatic for the drying kiln.
- WTG-SK Banská Bystrica – delivery of the stainless steel ekonomizer.
- BREMA Praha – delivery of the after-colling heat exchanger SKS 0,15 MW.
- AMMANN Nové Město n./M. - modification and repair of coal boiler 11,6 MW.
- STYROTRADE s.r.o. Čakovičky – delivery and installation of the steam accumulator and connection of the block form.
- Hedva Moravská Třebová – delivery and installation of the feed water tank with equipments.
- Autopal Hluk – delivery and installation of economizers on boilers 6t/h.
- Wunderer Znojmo – installation of the boiler 6 t/h, completion of the economizer, water treatment.
- Fruta Kunovice – general repair of the boiler VSP 4 t/h, completion of the economizer.
- KOWA Ledeč n/Sázavou – delivery and installation of the automatic sand filter, diameter 2500mm, including valves and automatic control.
- Veolia Memsep Praha – delivery of 2 pieces of the sand filters, diameter 2500mm for Russia.