For Vimex AL.Nemsavia located in Deil EZ ZOR, SEA CZ, a.s delivered as a subcontract a boiler OKP 25 T 94 equipped with the burner RAY BGE 1500 to burn heavy heating oil. Our company equipped the boiler with a valve, electromotive installation, instrumentation and controls. The boiler was transported via Hamburg to the port of Lakatia. After the assembly carried out by a Syrian company our service technicians were invited to put the boiler into operation. During 14 days (incl. arrival, departure) the boiler was put into operation and tested for 4 days. During the visit of our technicians it was necessary to complete or modify the electromotive installation at our presence, to finish the inlet of the heating oil to the burner. The boiler was put into operation without any comment made by our customer. Our technicians took many snaps some of which we publish here: