Supply and installation of the new boiler SBK3 with Eco, saturated steam 3 t/h, low emission gas burners Weishaupt, new chemical water treatment, M+C, EMI, control system, pipelines, chimney, project for building permit, design project. Installation of a replacement steam source 2 t/h during time of the boiler house reconstruction
Supply and installation of the boiler room with the steam boiler/accumulator SBAK 600 of nominal output 1 t/h, 32 bar saturated steam, immediate steam power as accumulator - 30 t/h , gas low emmision burner, chemical and thermal water treatment, pipelines, MaC, EMI, chimney, steam piping 32/21 bar, steam reduce station 32/21 bar, condensate piping, regenerating steam superheater -21 bar 480°C, wet washer
Complet overhaul of utilization boiler - changing of boiler tubes by change of drums distance
Eco-friendly modification of the boiler K1, K2, both 50 t/h. Complet overhaul of the boiler pressure part - new boiler with original drums - new combustion chamber, front and rear wall, new preheater, new boiler bundle. Addition of 2 new blocks Eco and addition of new calorifier for subcooling the boiler feed water. New Saacke gas burner
Supply and installation of the two boiler SBK 8, saturated steam 8 t/h, gas low emmision burners Weishaupt, Eco, EMI, MaC, design project
Supply and installation of the new boiler SBK 6, saturated steam 6 t/h, 1,2 MPa, Eco, gas burner APH 45PZI, M+C, EMI, project for building permit, design project
Supply of the water tube boiler SKP 12, preheated steam 12 t/h, 12 bar
Supply and installation of the boiler house with the boiler SBK 12, satureted steam 12 t/h, 10 bar, Eco, stainless water heater for additional water, low emmission burner Weishaupt, gas reducing station, steam accumulator 20 m3, chemical water treatment with mechanical filtration and reverse osmosis, thermal water treatment, feed water tank 20 m3 with built-in steam exchanger for additional water, pipeline, connection of autoclaves, control system, MaC, EMI, project for building permit, design project
Boiler room extension – delivery of the steam boiler SBK 8, ekonomiser, the burner APH 90, BOSB, control station, water treatment, regulation station of the gas, pipelines distribution
Delivery of the boiler 5t/h, the boiler SBK 2,5, economisers, the burners APH 25, BOSB Spirax Sarco, control station, chemical water treatment, heat water treatment
Delivery and installation of the boiler SBK 6, gas burner APH 45 PZI
Slovensko – general delivery of the high pressure steam boiler SKR 22, 22t/h, 65bar, 450oC – 5 fuel types – coal, wood chips, liquid fuels, natural gas including delivery of the building, M+R, EMI, piping and coal handling.
Delivery of the boiler 2t/h, the boiler SBK 2, ekonomizer, feed water tank, water heater, delivery of the chemical water treatment.
Dodávka vysokotlakého parního kotle SKP 7, 7 t/h, 69 bar, 450 °C, hořák Saacke – subdodávka pro fy. Ohnůt Zlín
Overhaul of the steam boiler BK8 and installation of the steam superheater to the second flue draft, replacement of the boiler economiser OKP 16.
Delivery and mounting of new steam boiler SBK 4 with steam superheater, delivery and mounting of repair burner Saacke SKVJG 40 for burning TTO, delivery and mounting of new water works station, delivery and mounting mechanism for automatic running of water works, BOsB ERAB for SBK 4 P and OKP 8 including boiler-room
Delivery and mounting two steam acumulators, delivery and mounting of steam boiler SBK 4 including economiser, burneru APH 45, BOSB Spirax Sarco
Final delivery boiler-room BK 6,5 + BK 8, including steam superheatrs, economiser, BOsB control system, I&C
Final delivery of steam boiler-room technology 2x2t/h including water works and BOsB
Mounting steam boilers Danstocker TDC 9 and reconstruction of boiler BK 12 with burners Weisshaupt including economisers
Delivery and mounting hot-water boiler-room 2,2 MW including control system
Delivery and mounting of boiler BK6 and BK8, burners Weishaupt, control system, water works, acid decarbonisation, BOsB Spirax
Delivery and mounting of boiler BK 2,5 vč. gas inlet, water works, delivery of boiler 1,6t/h with burner APH 16, BOsB for boilers BK 2,5 and BK 1,6t/h
Reconstruction of a oil steam boiler house with the boiler SBK1,5, 1,5 t / h, saturated steam, 0,4 MPa, oil burner Weishaupt, chemical and thermal water treatment, oil supply pipeline, exhaust gas duct, MaC. Block arrangement of the boiler room
Supply and installation of the boiler SBK 5, superheated steam 220°C, 10 bar, Eco, steam preheater, gas low emmision burner, MaC, EMI, chimney, control system, design project , project for building permit, design project
Replacing the steam boiler with a new one - SBK 6, preheated steam 220°C, 12 bar, Eco, gas low emmision burner Weishaupt, connection of the boiler to existing pipeline
Supply and installation of the boiler SBK 14, saturated steam 14 t/h, 12 bar, gas low emmision burner Weishaupt with silencer, Eco with silencer, EMI, MaC, chimney, design project
Supply and installation of the boiler SKP 18 t/h, preheated steam 250 °C, 22 bar, gas burner Saacke, 2 blocks Eco, feed pump block, MaC, EMI, control system, project for building permit, design project
Eco-friendly modification of the watertube boiler K5, preheted steam 25 t/h. Partly overhaul of the boiler pressure part - increasing of operating pressure, new preheater, modify of the evaporator, new condensator, new 2 blocks of, added exchanger flue gas/water for heating of manufacturing plant, burners for combined combustion of NG/bio gas
Supply and installation of the new boiler house incl. construstion of the boilerhouse with 2 boilers SBK 2, saturated steam, gas burners, Eco, chemical and thermal water treatment, M+C, EMI, control system, pipelines, chimneys, design project
Delivery of the heat accumulator 130m3, reconstruction of 2pc of the steam boilers to the hot water boilers SBK
Delivery and installation of the boiler SKP 16, 16t/h, 14bar, 280oC, 2 blocks of the economizers, gas burner, connection for distribution, project documentation.
Delivery and installation of the boiler BK 6, the burner APH M 45 PZI and ekonomizer.
Delivery and installation of the new coal ecologically boiler SKR 10t/h in in membrane design, reconstruction and ecologization of the boiler RK 8t/h.
Praha Smíchov – delivery and mounting the BK 12 boiler according general repair, economizer, the burner Saacke, BOsB Spirax Sarco
Delivery and mounting of boiler SKP 20 - 20 t/h; 1,8 Mpa, mounting system of pressure condensation returning
Excgange pipe of boiler BK 8, delivery and mounting new gas burners APH M - 90 PZ for 2x biler BK 8, BOsB ERAB for 2x BK 8 including boiler-room
Delivery a mounting 2 ks burnerů APH 90 na of boiler BK 8, výroba a mounting 2 ks ekonomizérů na of boiler BK 8 a BK 6, přetrubkování of boiler BK 4
Delivery and mounting of boiler 25 t/h, 1,4 MPa, 250 °C, combo burner Saacke DDZG 10 ZP/TTO, delivery two blocks of economisers, including project
New steam boiler-room - boilers THS 40 - 2 x 4 t/h, burners Weishaupt, BOsB, water works, including pipelines
Final delivery of steam boiler-room technology including complete project - mounting of boiler OKP 25 ( 3,8 MPa, 440st.C ), control system, water works, mounting of steam pipiline
Fumigation of boiler OKP 16 with burner SAACKE, industrial gas-pipeline including gas control station
Mounting of heating back-up power supply after brake down of powerplant Opatovice, 2x BK10, burner PHZ 880
Delivery and mounting of mobile power plant OKP 16, upgrade of steam pipelines, reconstruction water works for whole area, mounting BOsB to boiler 16t/h
SEA Kolín s.r.o.
Tyršova 469
280 00 - Kolín 2
tel: +420 321 729 249
seakolin@seakolin.cz
SEA Zlín s.r.o.
Zabrání 1116,
763 02 Zlín - Malenovice
tel: +420 577 101 085
seazlin@seazlin.cz