Area flumigation - warming-up TUV, complex hot-water delivery, 2x 940 kW, boilers TH Ratíškovice,burners WEISHAUPT
Delivery and mounting of repair gas boiler BK 6 with steam superheating, boiler-room control system – kaskáda cascade of gas boilers BK 6 and OKP 25
Ecologization of boiler 12t/h s mobile fire grate
1xBOsB SxS, automatic water works
Flumigation and BOsB of boiler VSP 4t/h + delivery of boiler BK 2,5t/h + inlet ZP
Waste-heat recovery, condensate management
Factory Bezděkov delivery of boiler 1,4 MW + burner Weishaupt
Delivery and mounting of control system, continual control emission and automatics with independent servomotors with electronic control of the proportion of burning for 4 burners on boiler 25 tp/h
BOsB on boilers 2x BK 10t/h and 1x BK6t/h + continual feed control
Steam boiler-room 1t/h including ÚV, BOsB, ÚT factory reconstruction
Delivery and mounting mechanical part of a new hot-water station
Instalation of steam boiler 1t/h including project
Delivery and mounting of condensate economy including I&C and project
Delivery and mounting of boiler BK 6 and BK 8 including ECO, burners Weishaupt, control system, TÚV + CHÚV - acid decarbonization, BOsB SPIRAX
Delivery and mounting of hot-water boiler 400kW
Reconstruction CHÚV and TÚV, BOsB
Reconstruction of boiler-room
Production, delivery and mounting of mobilepower plant BK 4
Ekologization of coal-boiler 10t/h, 16t/h, SPIRAX-SARCO steam measuration
Exchange, mounting and setting in operation 2x burner SAACKE
Mounting and setting in operation 2x3 burners APH 45 with combinated operation to ZP and DP, boilers 2x16t/h
A new gas boiler-room building with boiler OKP 25
Dodávka a montáž kotle BK 4
Delivery and instalation of boiler BGT 6,5, economiser instalation, TÚV
A new gas boiler-room VSP1.6
General reconstruction of boiler O 10 vč. BOsB SPIRAX-SARCO, periodical blow down, continual blow down
Repair of steam distribution, water pre-treatment and water works reconstruction for whole factory
Repair of three coal-boilers ČKD 8 t/h to fluidises combustion
Exchange of condensate tank 10 m3
Instalation of older boiler OKP 8, and reconstruction from steam to hot-water, Saacke burner instalationin
Ungutter pipeline steam distribution, hot-water distribution, TUV, II. part of area reconstruction
BOsB Spirax Sarco to VSP 4, VSP 6,5 - including automatic periodical blow down, exchange of burner APH M 45 PZ
Delivery of boiler BK 1,6 t/h
Repair of fire grate and ecologiration of boiler R 16
Drinking water works
Flumigation of boiler OKP 16, Weishaupt, control system
Reconstruction of boiler R10 to fluidises combustion
Ekologization of boiler 2x 35 t/h, control system, 4x gas-burner Weishaupt G70
Reconstruction of mazut boiler-room, 2x VSK 4, burners Weishaupt
Control system of hot-water boiler-room
Delivery of boiler BK 2,5, smoke extenders, pipes distribution, fittings
Reconstruction of boiler-room, UV, BOsB Spirax Sarco, exchange from burners Třebíč to burners Weishapt to LTO - 2 x BK 6 and 1 x BK 4
Provisional gas boiler-room VSP 4
Repair of pipes distribution
Repair of pressure system and fire grate of boiler RK 10
Delivery and mounting of hot-water boiler-room Viessman 3x 1,4 MW , 1x 0,7 MW , hořáky Weishaupt kogenerační jednotka GEB 160 CHÚV rekonstrukce vytápění, rozvody, plynová přípojka, stavební část, řídící systém
Local heating, heating reconstruction
Flumigation of boiler-room, mounting of additional hot-air tower to boiler BK 4
Mounting of boiler BK 6, new technology of boiler-room
Exchange of convective bundles and back site wall of boiler R 10
Mounting of boiler OKP 25
Building of a new gas boiler-room with boilers VSP 1 a VSP 4 including complete water service
Unmounting of two coal-boilers 35 t/h, mounting of a new gas-boiler K 75 t/h
General repair of boiler R 10H including fire grate
Dust exhaust of flue gases two boilers R 10H - fabric filters ZEOS - , delivery of gas boiler BK 10H, burner SAACKE
Delivery and mounting of boiler HBK 6,5 t/h. Reconstruction of boiler-room from steam to hot-water, BOsB ERAB, reconstruction of boiler OKP 16 for hot-water operation
Fumigation of coal-boiler 40 t/h, repair of boiler 65 t/h, mounting of new boiler OKP 25 for heating industry purposes including CHÚV - burner SAACKE
New boiler BK 10 with burner SAACKE
Exchange of pressure part OKP 8 H
Sequence change of gas-boilers OKP 25, 2x OKP 16
Change of convective parts of boiler 20 tp/h, hot-air tower, feedwater heater, steam superheater, exchange of de-ashing by 2 boilers ČKD 8 t/h
A new gas boiler-room 1x VSP 4, operation of boiler-room is out of lasting inspection
Delivery and mounting of mobile power plant OKP 16, steam pipelines modification, reconstruction of water pre-treatment room and water works for whole factory, mounting BOsB to boiler 16t/h
Delivery and mounting of boiler BK 1t/h + burner + fittings up take
2x BOsB Spirax Sarco to boilers VSP 2,5t/h, flumigation of boilers VSP 2,5t/h with burnersAPH
Flumigation and BOsB of boiler VSP 4t/h + delivery of boiler BK 2,5t/h + inlet ZP, ÚV
Reconstruction of water warming-down, a new cooling plants, water filtering
Delivery and mounting of boiler BK 2,5 including gas inlet, ÚV, delivery of boiler 1,6t/h with burner APH 16, BOsB for boilers BK 2,5 and BK 1,6t/h
Boiler BK 6t/h with burner APH 45 PZ, BOsB Spirax Sarco
Flue gasses boiler 4,4 t/h outside of melter
Delivery and mounting of boiler BK 4, BK 1,6 burners APH, gas inlet, control station, ÚV, BOsB Spirax-Sarco
Mounting of steam boiler BK1, delivery and mounting of burner WEISHAUPT to burning LTO, instalation BOsB ERAB including comlex project
Delivery and mounting cooling circuit of production line steel section including project
Exchange of condensate pipeline (600m, DN 150) in warmwater channel
Pressure complex repair of boiler 20t, instalation 4x junction exchange stations
General repair of steam boiler BK 8
Exchange control system of burner with electric control burning, switch on to existing ŘS including repair burning by actual burn, I. part of mounting new control system, boiler 16 tp/h
Reconstruction from steam boiler BK6 to hot-water boiler
Mounting of steam drum for chemical incinerator
Pressure system exchange and flumigation of boiler OKP 12 - mobile heating plant
4MW heat back-up power supply, lending, mounting, operation
Delivery, mounting and setting in operation 4x burner Weishaupt
Production, delivery and mounting mobile power plant, delivery and mounting of mobile boiler-room 4t/h - boiler with burner APH 45
General repair of boiler EMO CELJE 4 t/h
CHÚV + jumb feed control ERAB
Delivery and instalation of boiler OKP 16, burner SAACKE SG 150, EKO, automatic CHÚV, control system, 2x reduction steam station
Instalation of boiler CERTUS 0,85t/h, including gas inlet with cutoff and I&C, water works partial reconstruction
Gas boiler-room building with VSP 1600, gas inlet,BOsB including periodical blow down, TUV, CHUV
Pipes exchange of boiler BK 8
General repair to boiler ČKD 20 t/h
Reconstruction of recovery machinery
Boiler-room reconstruction, boiler exchange to 3x BK 8, reconstruction UV, ŘS, BOsB SxS
Instalation of steam brum for chemical incinerator, BOsB Spirax Sarco
4MW heat back-up power supply, zapůjčení, lending, mounting
Mounting of boiler 3 t/h, BOsB Spirax Sarco
Delivery of boiler BK 8
General repair of pressure part and linnings of boiler 35 t / h
Delivery and mounting of steam-boiler BK 6
General repair of boiler VSP 1.6
Flumigation of coal-boiler 5,8MW, gas regulation station, gas inlet
Pipes exchange of pressure complex BK 8
Flumigation of boiler-room 2x VSP 4, 1x VSK 4, Autoflame, monitoring system
Mobile heating plant 6t/hod
Dripping measuring in drip oil
Ekologization of coal grating boiler 10 t / h
Reconstruction of hot-water boiler-room 2x KDVE 25
Exchange of steam-overheating and economiser on boiler 20 t/h
Mounting of a new gas boiler-room VSP 1,6 + gas inlet
New gas inlet and mounting of mobile heating plant GENERÁTOR, delivery and mounting of gas boiler-room2x BK 6,5
Hot-water inlet
Flumigation of boiler BK 6
Modification of aluminium tanks, mounting of colling down basin, pipings, connector to machines of central heating
Complete mounting of fittings up takes, feedwater heater and hot-air tower
Mounting of boiler BK 10 including gas inlet
Unmounting of coal-boiler R 16, mounting of a new gas-boiler OKP 12
Mounting of boiler-room BK 4 a OKP 16 including reg. station of gas
Delivery of boiler BK 4
Building of boiler-room including water works and hot-water pipes [3 500 m] 1x 7,1 MW/h; 2x 4,5 MW/h
Building of gas boiler-room 2x 2,5 t/h including TÚV and CHÚV control station of gas of boiler SLATINA VSP
Reneral repair of gas-boiler 50 tp/h - burners SAACKE
Mounting of new gas boiler-room 3x BK 10 a 2x BK 6,5
Fumigation of mazut-boiler OKP 8 and a new boiler BK 10 with burner APH 90
Reconstruction of two oil-boilers OK 10 and mounting of boiler BK 10 with burner WEISHAUPT including a new CHÚV
General repair of boiler K1 20 tp/h including fire grate
SEA Kolín s.r.o.
Tyršova 469
280 00 - Kolín 2
tel: +420 321 729 249
seakolin@seakolin.cz
SEA Zlín s.r.o.
Zabrání 1116,
763 02 Zlín - Malenovice
tel: +420 577 101 085
seazlin@seazlin.cz