Delivery of the boiler 8t/h, chemical water treatment, the burner APH 90 PZ
Delivery and installation of the steam-condensate pileline for lines 8, 9 and 10
Delivery of the boiler 5t/h, the boiler SBK 2,5, economisers, the burners APH 25, BOSB Spirax Sarco, control station, chemical water treatment, heat water treatmen
Boiler room extension – delivery of the steam boiler SBK 8, ekonomiser, the burner APH 90, BOSB, control station, water treatment, regulation station of the gas, pipelines distribution
Delivery of the 2pc of the gas burner Saacke SKVJG 50 on the boiler BK6
Repair of the superheater on the boiler 50t/h, 40 barg, 450°C and 25t/h, 40barg, 450°C
Repair of the pressure part of the boiler R16
Repair of the steam superheater, delivery BOSB Spirax Sarco – for Ohnůt co., Zlín
Delivery of the pressure vessels and separators
Delivery of the heater, deaerator and steam reduction station
Mongolian Embassy
Modification and repair of the coal boiler 11,6 MW
Delivery of 2pc of after-cooling heat exchanger for incinerator
BOSB, security of the boiler
Delivery of the boiler 2 t/h, the boiler SBK 2, ekonomizer, gas burner, BOSB Erab
Repair of the boiler BK4
Reconstruction of locomotive U46, 422.009 and EP 1000/32
General reconstruction of the boiler house
General delivery of the high pressure steam boiler SKR 22, 22t/h, 65bar, 450oC – 5 fuel types – coal, wood chips, liquid fuels, natural gas including delivery of the building, M+R, EMI, piping and coal handling
Delivery of the boiler 2t/h, the boiler SBK 2, ekonomizer, feed water tank, water heater, delivery of the chemical water treatment
General repair and installation of 2 pieces of the boilers BK 2,5, ekonomizer, general delivery and installation of the steam boiler technology, chemical water treatment, thermal water treatment, feed water tank and supply of natural gas
General repair of the steam boiler of the locomotive U37.002
Adaptation and interconnection of all thermal station in hospitals building including develop of the detailed project documentation
Delivery and installation of the gas heating in the production halls with units ROBUR
Installation of reservoir of the thermal water treatment plant with using of waste heat compressors
Delivery and installation of the hot water boiler with a Viessmann boilers in the company WEZI-TEC Legnica, Poland
Delivery of expanders and feed water tanks, delivery of the steam separators
Refurbish and installation of the burner Huerbel, Belgium including new automatic for the drying kiln
Delivery of the after-colling heat exchanger SKS 0,15 MW
Delivery and installation of the steam accumulator and connection of the block form
Delivery and installation of economizers on boilers 6t/h
General repair of the boiler VSP 4 t/h, completion of the economizer
Delivery of 2 pieces of the sand filters, diameter 2500mm for Russia
Delivery of the high-pressure steam boiler SKP 7, 7t/h, 69bar, 450oC, burner Saacke – from subcontractor company Ohnůt, Zlín
Delivery and installation of the heating exchange station and heat TUV, installation of steam piping, aftercooler condensate diameter 1400mm delivery
Delivery and installation of technology of chemical water treatment
Repair of the grate-shaped boiler 11,6 MW
Installation of the boiler BK8
Complex modifications to reduce energy costingness for heating - hot water heating
Delivery of the acumulator of steam 15m3, stainless steel economiser behind the steam boiler 5t/h
Installation of the economiser on the boiler BK8
Repair of steam and condensate piping, supply and installation of the air tank
Delivery and installation of the new coal ecologically boiler SKR 10t/h in in membrane design, reconstruction and ecologization of the boiler RK 8t/h
Delivery of the gas steam boiler 20 t/h, the boiler LOOS including the construction and piping
Overhaul of the steam boiler BK4
Reconstruction – modernisation of burners Saacke
Reconstruction of the steam distribution
Reconstruction of the steam boiler in the Bath house Moravan
Delivery and mounting the boiler room 10 t/h, the SBK 8 and BK 2 boiler, BOSB Spirax Sarco, TUV, CHUV – reversing osmose, control system, delivery central mechanical filtration of service water. The steam accumulators 9 m3, steam pipe-line connecting, the control system gases and gas distribution
General repair of heat-water boiler 1,7 MW
CHUV for boiler room, CHUV for technology, 2 pcs AT stations, pipe-line distribution
Adjustment of heat-water boiler room, aquitherm regulation
BOsB Spirax Sarco for 2 pcs hot-water boilers á 7,0 MW and hot-water system
Oil measuring in the returning condensation, stainless condensate basin
Repair of steam pipe-lines, delivery and mounting stainless pipe-lines of condensation
Delivery of hot-water exchanger incl. economizer for the Jihlava incineration – G.D. Metrostav Praha, pressure compensator, delivery of divider and interceptor, delivery of fire-tube exchanger
Delivery of TUV machinery for the TELLO Šumperk company
Repair of boiler superheater 65 t/h 38 bar 450°
Delivery and mounting of feeding basin 16 m3. Delivery degasser r. 1000 – mounting + dismounting current basin and degasser
Transformation the BK 4 steam boiler onto hot-water, control system, instrumentation and control, hot-water heating of TTO accumulators
The transformation of the 2 pcs OKP 25 steam boilers onto the OKP-25-H hot-water boiler, delivery the BK 8 hot-water boiler
The manufacture and the exchange of superheater the BAY boiler
The decentralization warming , back bone gas distribution and installation local source, the boiler room TPV 200 kW, the gas radiant panels and the gas air-heating set „LARSEN“
The reconstruction of heating and TUV, development of central warm-water boiler room with the boilers LOOS 3 x 2,7 MW for the fuels earth gas and firedamp DEGAZ. Delivery and installation of the waste-heat boiler 2,2 MW for heat utilization from the rotary hearth furnace
The installation of the heat and chemical water-works for current steam gas boiler room in the part of factory called „Slaughter“ incl. installation the facilities BOsB ERAB. Development of the new steam gas boiler room with the boiler output 1,6t/hour incl. subterraneous gas-fixture and no canal steam distribution
The delivery and mounting of the chemical water-works for the steam boiler room
The reconstruction of the 2 pcs burners SAACKE, extension the elctronic proportion of fuel/air – Etamatic, installation of the new regulation gas lines, new electrical set of the 2 pcs boilers OKP 16, delivery and installation the steam reduction station for de-gassing, delivery and installation components of instrumentation and control – metering of steam for the 4 pcs boilers, metering condensation, metering additional water
Delivery and mounting gas pipeline, mounting gas burners
Delivery and mounting of boiler SKP 20 - 20 t/h; 1,8 MPa, mounting of pressure condensation returning system
Fumigation of boiler-room - delivery of burner APH M 45 PZ, gas control system, BOSB Spirax Sarco
Delivery of steam acumulator
General repair economiser of boiler 4 t/h
Delivery two exchanges
Thermooil pipelines including exchange station oil/oil, pipelines of thermooil
Delivery and mounting of thermooil boiler
General repair of boiler Viessmann
Delivery and mounting of boiler BK 2,5 with economiser, burner Weishaupt
General repair of boiler MON 3 including exchange of rear turning closet
Delivery and mounting machinery TÚV, mounting of boiler MINGACINI with burner RIELO
Delivery and mounting two steam acumulators, delivery and mounting of steam boiler SBK 4 including economiser, with burner APH 45, BOSB Spirax Sarco
General repair of boiler Buderus
Mounting mobile power plant BK 6, fumigation of boiler BK 4, BK 8 combo burner RAY and Saacke
Delivery and mounting 2 ks of burner APH 90, control system of boiler-room, CHÚV
Delivery a mounting chemical and heat water works (4 m3/h), mounting kombinovaného of burner SAACKE to boiler VSP 4, delivery and mounting machinery BOsB ERAB including passing operation boiler-rooms with unmanned perm service
General repair of boiler VSP 2,5
Production and mounting economiser to boiler R 16
Control system of operation steam pressure rooms including mechanical reconstruction, delivery and mounting economiser to boiler VSP 6,5 including feed control
Production three pressure tanks
BosB ERAB , boiler BK 8 and boiler-room
Upgrade of boiler BK 6 for economiser
Pipe exchange of boiler BK 8 + turning closet, delivery and mounting of new gas burners APH M – 90 PZ for 2x boiler BK 8, BOsB ERAB for 2x BK 8 including boiler-rooms, 1x delivery and mounting EKO to BK 8
Delivery and mounting steam metering and feed control two steam boilers PK 4
General repair of hot-water boiler
Fumigation operation, complex resolution of heating, hot-water boiler-room 2 x 66 kW
Delivery and mounting BK 2,5 APH M 25 PZ, BosB
Steam acumulator
Katex 200
TUV, general repair of exchanger
Repair - pipe exchange of flue deaeration for boiler HOVAL 6 t/h
Brine of average 800
Repair flue steam boiler
BosB ERAB on boilers 4 x BK 6 in heat station Benešo
Mounting of mobile power plant 6 t/h, connect to boiler BK 4, delivery and mounting steam superheater of boiler BK 4, delivery and mounting burner Saacke on boiler BK 4 to burn burning oil and landgas
Delivery and mounting of condensate escapement
Delivery of rustless filters pr . 600
General repair of boiler, power increase
Production of flue exchanger 1120 kW, delivery of economiser flue exchanger 1120 KW (Litva)
New steam boiler-room - of boiler THS 40 - 2 x 4 t/h, burners Weishaupt, BOsB, water works - TUV, CHUV, including pipelines
Fumigation of area, hot-water boiler-room, gas radiators
Upgrade of economiser on BK 8
General repair of boiler MON 10, repair turning closet of boiler MON, BOsB, continual feed control
Delivery of boiler 8 t/h, I&C, BOsB
General repair of steam boiler BK 8
Exchange of burner on steam boiler BK 1,6 t/h, mounting machinery BOsB ERAB including project and passing of running of boiler-room unmanned everlasting service on ITI Brno
Delivery and mounting two economisers on boiler BK 8 and BK 4 including feed control
General repair of boiler MON 12 t/h, general repair of boiler BAY 12 t/h, repair of industrial gas pipeline, lending of mobile power plant 2,5 t/h
Delivery and mounting of boiler-room 1,6 t/h, hot-water boiler-room 1x 1 120 kW 1x 925kW 1x 405 kW, hot-water boiler-room 50 kW
Pressure tank pr. 600, reconstruction reducing stations, delivery and mounting of economisers
Repair of steam boiler
Production hot-water exchange
Delivery and mounting of reconstruction gas burner APH 45 to BK 6 including gas pressure control for boilers BK 8 and BK 6
Final delivery technology of steam boiler 2 x 2 t/h including CHÚV, TÚV and BOsB
Final delivery technology of steam boiler-room including project - mounting of boiler OKP 25 ( 3,8 MPa, 440st.C ), delivery and mounting of burner to burning wet natural gas SAACKE DDG 10, control system, TÚV
Reconstruction CHÚV and condenzate economy - unmanned system of koiler-room ERAB for three steam boilers including automatic periodical blow down
General repair of steam boiler BK 8 including backside room and walls
Delivery and mounting of boiler OKP 12 including combination burner SAACKEto burning animal oil
Repair of fire grate of boilers RK 8 and R 16
Delivery and mounting of combination burnerSaacke SKVJG 80 to burning ZP/TTO and animal oil
Delivery and mounting steam condenzator of boiler 65 t/h, 440 st.C, 3,8 MPa
General repair of two hot-water boilers OV 100
Delivery and mounting of econoiser on boiler Moning 12 t/h
Delivery and mounting of boiler BK 6,5 including burner APH 45 PZI
Production of heating station TTO 2 x 20 m2 for PBS Třebíč, two blocks
Delivery and mounting of boiler BK 8 including economizer, burner APH 90
The production and delivery of the Abator for the archival gas combustion
Delivery and mounting of repaired combination burner SAACKE - SKVJG 50 for steam boiler BK 8
Reconstruction of 2x steam boiler VSP 4 from superheated steam to saturated steam
General repair of steam boiler BK 8
Exchange of steam superheater on boiler OK 65 t/h, 3,8 MPu 440st.C
Delivery and mounting of steam boiler BK 4 with burner APH 45 PZ
Delivery and mounting of reconstruction boiler BK 12 and burner SAACKE in besign kombi
Complex delivery of boiler OKP 25, T94 and burner RAY by TTO including SŘTP, EMI
Reconstruction 3 x 4x stability gas burner for DP on K2, K3, K4 - 85tp/h
Delivery and mounting of burner APH-M 45 PZI on boiler PKG 6,5
Delivery and mounting of burner APH-M 45 PZ on boiler VSP 2500
Lending of mobile steam power plant 2,5 t/h, delivery, mounting
General repair of obiler BK 6, new burner control of boilers BK 6, BOsB ERAB to hot-water system, heating pipeline and UT by factory
Repair of fire grate of coal boilers RK 8, repair CHÚV
Reconstruction of boiler 12 t/h, control system
Instation of back-up power supply of heat after crasch of Opatovice power plant, 2x BK10, burner PHZ 880
Delivery and mounting of burner SAACKE to burning animal oil, TO a ZP on boiler BK 6, ŘS, SŘ
Delivery and mounting of central heating TÚV
Production, delivery and mounting of pressure part of boiler
Comlex reconstruction ÚT, delivery + munting exchange station
Exchange 3x burner controls ( 3 boilers ) reconstruction and completion gas parts by legislature, gathering and transmiting of informations for superior control system
General repair BK8, including setting in operation
New TÚV, BOsB SPIRAX, periodical blow down, continual blow down
Delivery of three burners Weishaupt, reconstruction boiler head and mounting, setting in operational 6x burner Weishaupt
Exchange 4x electric control on burners APH
Repair of coal boiler R 10H, partial exchange of pressure complex
BOsB of boiler-room, control system of boiler-room and funnel rooms
Repair of pressure complex OKP 25, production and mounting of economiser for boiler BK 8
Reconstruction four stabilizing burners to DP to K1 - 85 tp/h
Gas boiler-room 2 x 10 t/h, Loos with burners Weishaupt, VHÚV + TŮV, control system
Back-up power supply building, BK 12 + PHZ, BOsB Spirax, control system
Delivery and mountind of automatical CHÚV
Delivery and mounting of boiler BK6 and BK8, burners Weishaupt, control systemm, TÚV and CHÚV, acid decarbonization, BOsB Spirax
Plynofikace kotle OKP 16, reconstruction of gas part of burner SAACKE, pipelines of gas, measuring and control station of gas
Optimalization of the heat pipelines – reconstruction of the exchange station, reconstruction of the boiler room
General reconstruction of 2 pieces of the boilers of steam locomotives for museum ČD Lužná u Rakovníka
Exchange of the burner APH 45 on the boiler BK4
Complete measurement, regulation and electroinstallation for the boiler VSP 4t/h, BOSB Erab
Installation of the safety valves for the off-gases from chemical operations
Repair of the pressure part of the boiler OKP 5H and installation of the burner APH 90
Delivery of the steam drum for chemical furnace
General repair of the BK8
Delivery and installation of the boiler SBK 6, gas burner APH 45 PZI
Delivery of the heat accumulator 130m3, reconstruction of 2pc of the steam boilers to the hot water boilers SBK
Delivery of the new automatic control of the combustion process in the boiler
Delivery of the new automatic control of the combustion process in the boiler
Delivery and installation of the steam-condensate pipeline for lines numbers 6 and 7
Reconstruction of the boiler house in the primary school and kindergarten
General reconstruction of the boiler house
Delivery and installation of the boiler SKP 16, 16t/h, 14bar, 280oC, 2 blocks of the economizers, gas burner, connection for distribution, project documentation
Delivery and installation of the hot water boiler with the boiler Viessmann in COLOR PROFI Boskovice company
Delivery and installation of the boiler BK 6, the burner APH M 45 PZI and ekonomizer
General repair of the boiler BK 8, production and installation of ekonomizer, replacement of the burner APH M 45 PZ
Delivery and installation of equipment for biogas combustion in the boiler 25 t / h, general repair of the steam superheater boiler 25 t/h
Manufacture and delivery of the steams air heater SOVZ 240
Total general repair of 2 pieces of the boilers BK8 – K3 and K4
Reconstruction of the distribution of heat in the whole area, boiler repairs – delivery of the new boiler SBK 2.5, reconstruction of the water treatment, delivery of the ekonomizer of the existing boiler
Delivery of steams separators
Delivery of the stainless steel ekonomize
Modification and repair of coal boiler 11,6 MW
Delivery and installation of the feed water tank with equipments
Installation of the boiler 6 t/h, completion of the economizer, water treatment
Delivery and installation of the automatic sand filter, diameter 2500mm, including valves and automatic control
Delivery and installation the boiler SBK 4, with ekonomizer, steam acumulators, chemical water treatment, TUV, the condensate tank, the feed water tank
The manufacture and delivery of the flue gas heat exchanger 1400kW, delivery of the exchanger EKO SKS 1000 nad 150 kW
Delivery and installation of the boiler SBK 6, ekonomizer, steam accumulator, chemical water treatment, TUV, condensate tanks
Reconstruction of the hot-wather boiler room with boilers PGV250, exchange of burners APH M 16 PZ
Overhaul of the boiler BK8 – K2
Delivery of the feed water tank NV 55m3
Delivery and installation of the boiler SBK10, overhaul of the original boiler BK8 in Bedele
Delivery of the after-cooling heat exchanger SKS 0,15 MW
Manufacture and installation of the economisers on the steam boiler Wyncke 8t/h and 10t/h
Delivery and installation of superheaters and economisers on the steam coal boilers RK 8
Replacement of the burner on the boiler BK 8, feed pumps and pipes
Reconstruction of the steam distribution system in the company
Overhaul of the steam boiler BK8 and installation of the steam superheater to the second flue draft, replacement of the boiler economiser OKP 16
Delivery and installation of the pump air-water Viessmann 28kW including accessories
Delivery and mounting the BK 12 boiler according general repair, economizer, the burner Saacke, BOsB Spirax Sarco
General repair 2 pcs of the VSP 2500 boilers
Central UV for whole factory, UV for boiler room, AT stations, pipe-line distribution, control system
Steam and condensation distribution for technological line, stainless distribution, blows of line-head
General repair of economizer for the boiler 4 t/h, repair TUV, repair VS
Parts for the general repair boilers 11,6 MW – delivery of conventional tie, chambers
Repair of the transported OKP 12 heating plant in Oslavany, pipe-line distribution
Repair of recuperative exchanger
The transformation of hot-water boiler room 2,0 MW, new control system, delivery and mounting instrumentation and control
Upgrade BOsB Gestra for the BAY boiler 1 t/h
Transformation the hot-water boiler 0,5 MW onto chip wood burning onto steam low-pressure, UV, distribution
CHUV, chemicals dispenser
Delivery of the boiler pressure part 1,5 MW onto the burning straw
Delivery of the filter emollient 1000mm in stainless design, dismounting of the current filter 1400 and mounting a new filter. The replacement of the boiler superheater OKP 25 VTML Mariánské Lázně – incl. manufacture
The delivery and the replacement of entire pressure complex coaly steam boiler RK4
The delivery of the chemical water works 15m2 / hour – the acid decarbonization incl. delivery of constructional part
The delivery and mounting of preheating finished water for the steam boiler room
Mounting of the outdoor distribution heating water
Ecologisation of boiler RK 11,6 MW
Reconstruction of water works
Delivery and mounting steam pipeline
Mounting - mobile power plant 2,5 t/h
Heat water pipelines for climatisation of new factory, steam inlet and condensation for new factory including pipe bridges
Repair of steam boiler VSP 2,5 t/h
Hot-water boiler-room 400 kW for production link, pipelines of pressure air, pipelines of cooling water
Reconstruction CHUV with usage items Culligann
Demounting and mounting rustless shaft
Delivery of pressure tank SEV 1000
Production flue exchanger 370 kW, delivery economiser flue exchanger 370 KW (Jihlava)
Delivery and mounting boiler-rooms 7,0 MW with boiler HBK 10, gas pipelines, water works
Repair fire grate of boiler R 16
Repair fire grate of boiler RK 12
General repair of boiler BK 10
Delivery and mounting machinery ERAB for steam boiler-room 4 t/h including passing with unmanned perm service.
Delivery and mounting machinery for animal oil burning ob boilers BK 12 and BK 8 with burners SAACKE
Delivery and mounting two burners APH 90 on boiler BK 8, production and mounting two economisers on boilers BK 8 and BK 6, pipe exchange of boiler BK 4
Pipe exchange of boiler BWE TOMA 2 MW
Production economisers to boilers RK 4 and R 8
Production and mounting rear turning closet to boiler BK 4
Delivery and mounting of nwe steam boiler SBK 4 with steam superheater, delivery and mounting reconstruction of burner Saacke SKVJG 40 for burning TTO, delivery and mounting new automatic water works stations CHÚV, delivery and mounting machinery for automatic running of water works, BOsB ERAB for SBK 4 P and OKP 8 including boiler-rooms
Delivery and mounting burners De Dietrich, reconstruction heating TÚV in house boiler-rooms
Exchange of deaeration - SEA product
Boiler-room Zbraslav - BOSB Spirax Sarco to four boilers BK, control system of boiler-room
CHUV, TUV, general repair of boilers DURO Dakovič 8 t/h, BosB, control system for UV.
Hot-water boiler 500 kW on wood waste
Delivery of exchanger for burning-house
Repair steam superheater of boiler OKP 25
Repair backing RK 25
Repair of boiler KLT 350 P
Pipe exchange of flue excganger WSCM 100S japan production
Delivery and mounting of steam inlet for new factory, including pipeline bridges - reconstruction of boiler K 4 - delivery and mounting of burner APH 90, economiser, BOSB Spirax Sarco, connect on control system
Repair of gas pipelene on ovens, delivery and mounting hot-air aggergates, delivery and mounting of hot-water boiler-room with boiler Viessmann, repair pipelines
Delivery and mounting of hot-water pipeline
Delivery and mounting of boiler BK 2,5; burner APH 25, BosB
General repair of boiler PGVE 65
Final delivery of boiler-room BK 6,5 + BK 8, including of steam superheaters, economiser, BOsB control system, I&C
Boiler BK 8 including I&C
Delivery of boiler-room - boiler BK 1,6 with economiser and steam superheater, heating and chemical water works, I&C, gas inlet, burner APH 25, boiler-room - mechanical part
Delivery and mounting reconstrucional gas burner APH 90 PZ for boiler BK 8
Delivery and mounting of boiler 25 t/h, 1,4 MPa, 250 °C, kombo burner Saacke DDZG 10 ZP/TTO, delivery two block of economisers, fittings up take, pipelines, including project
Repair of steam boiler 2,5 t/h, mounting machinery BOsB ERAB including project and passing of running steam boiler-room unmanned everlasting service on ITI Brno
Reconstruction of central steam boiler-room to hot-water including control system
Delivery and mounting of burner APH - M 45 PZI on boiler BK 6
Delivery and mounting EKA on two boiler BK 10, reconstruction of pipelines TUV
Repair fire grate of boiler 12 t/h
Production of economiser for steam boiler
General repair of boiler 8 t/h, back turning closet and stem superheater on boiler, repair of fitting up takes BK 8
Delivery and mounting technology CHÚV boiler-room - reversing osmose
Delivery and mounting combination burner SAACKE SKVG 80 to boiler BK 12
Mounting of boiler DANSTOCKER tdc 9 with burner Weisshaupt including smoke-stack and BOsB ERAB
Delivery and mounting ofreconstruction boiler BK 6 with burner APH 45 PZI including BOsB Gestra - reconstruction of gas pipelines of boilers-room
Instalation of steam boilers Danstocker TDC 9 and reconstruction boiler BK 12 with burners Weisshaupt
Delivery and mounting of combination burner Saacke SKVJG 50 to burning ZP/TTO and animal oil control system
Reconstruction VS, delivery and mounting water heating
Delivery and mounting two combination burners Saacke SKVJG 80 to burning ZP/TTO and animal oil, control system
General repair of fire grate of coal boiler R 12, tube pipelines
Ecologize of fire grate boiler R 5,5 MW
Delivery and mounting of two economiserson boiler BK 10 t/h
Delivery and mounting of hot-water boiler 0,7 MW including burner APH 16, M+R, pipelines
General repair of two boilers Dakovič 8 t/h, BOsB Spirax Sarco, control system
Production of new hot-water boiler, construction works
Central inlet of fresh water for whole area
Delivery automatic CHÚV - acid decarbonization
Delivery and instalation of steam boiler- room, including CHÚV, TÚV, boilers 1xBK 2,5 1xKU VP 1000 with unmanned system
General repair of steam boiler BK 8
Delivery and mounting of steam boiler-room including CHÚV and TÚV, boiler KU VP 1500
Exchange of steam superheater on boiler G 35 t/h, 3,8 MPu 440 st.C
Delivery and mounting of burner SAACKE to burning animal oil on boiler BK 8
Delivery, mounting and setting in operation 3x burners Weishaupt G9 on boilers MON 3
Delivery and mounting of hot-water boiler-room 2,2 MW including controlsystem
Delivery and mounting of feed tank 15m3 including degasser
Mobile hot-water power plant, boilers Wiessman 720 kW and 180 kW, burners Weishaupt
Delivery and mounting of complex ÚV, CHÚV Eurowater - acid decarbonization, complex new TÚV
General repair of fire grate of boiler RK 16
Pipeline ZP, delivery and mounting of gas radiator
Mounting of boiler BK 6,5 economiser, BOsB Spirax Sarco
Delivery and mounting of burner APH 90 on boiler BK 12
Delivery pressure tanks for rubber working
General repair of boiler 2x 64m2
Reconstruction of burner controls PHZ 420 including new gas version BK6
Delivery and mounting of steam boiler-room 4,6 MW boiler BK6,5 and burner APH 45 PZI
Repair of steam boiler ČKD 12 t/h - exchange of steam superheater and economiser
Mobile hot-water boiler-room, boiler Viesman 1400kW, burner Weishaupt
Reconstruction and completing gas burner SAACKE for oil part, delivery, mounting and setting in operational electric control of boiler for two indipendent servomotors, 16t/h
General repair of steam boiler BK6 and reconstruction CHÚV and TÚV
Exchange of steam superheater on boiler G 35 - 3,9 Mpa, 445 stC
Production and exchange of steam superheater, boiler Kessel - Loos 8
Delivery and mounting of steam boiler-room, boilers LOOS 2x 10t/h, burners Weishaupt, delivery of CHÚV, TÚV, complex project
Boiler-room fumigation, BK 8 + APH 90, control system of gas
General repair of pressure part of boiler ČKD R8
Delivery and mountind of boiler BK 8 including atypical steam superheater + burner RAY to TTO
Repair of boiler OKP 12, instalation of burners APH 90 to boilers OKP 12 and BK 8
Delivery and mounting of boiler-room 1 t/h, TÚV, CHÚV, BOsB ERAB, gas inlet + control system, pipelines of gas by factory
SEA Kolín s.r.o.
Tyršova 469
280 00 - Kolín 2
tel: +420 321 729 249
seakolin@seakolin.cz
SEA Zlín s.r.o.
Zabrání 1116,
763 02 Zlín - Malenovice
tel: +420 577 101 085
seazlin@seazlin.cz