Supply and installation of the new boiler SBK3 with Eco, saturated steam 3 t/h, low emission gas burners Weishaupt, new chemical water treatment, M+C, EMI, control system, pipelines, chimney, project for building permit, design project. Installation of a replacement steam source 2 t/h during time of the boiler house reconstruction
Supply and installation of a new boiler SBAK1, 12 bar, superheated steam 1 t/h, economizer, low NOx burners Weishaupt , chemical and thermal water treatment, M+C, EMI, control system, pipelines, chimney, pipeline connection for natural gas, project for building permit, design project
Supply and installation of the new low NOx burners Weishaupt for hot water boilers BK 2,5, BK 4, BK 6, 6 bar
Reverse chamber changing of the steam boiler BK2,5
Supply and installation of hot water boiler room with two wall condensing boilers Viessmann 48 kW each, exhaust flue gas ducts, pipeline, preparing of hot water, MaC
Supply of the repaired boiler BK6 with new Eco, new gas burner for LPG combustion, new switchboard MaC, supply of feed water tank with steam deareator
Supply and installation of a new boiler SBK 8 instead of existing boiler BK 2,5. Saturated steam 8 t/h, 12 bar, gas low emmision burner Weishaupt, connection of the boiler to existing piping, chimney, project for building permit, design project
Eco-friendly modification of the boiler K1, K2, both 50 t/h. Complet overhaul of the boiler pressure part - new boiler with original drums - new combustion chamber, front and rear wall, new preheater, new boiler bundle. Addition of 2 new blocks Eco and addition of new calorifier for subcooling the boiler feed water. New Saacke gas burner
Supply and installation of the boiler room with the steam boiler/accumulator SBAK 600 of nominal output 1 t/h, 32 bar saturated steam, immediate steam power as accumulator - 30 t/h , gas low emmision burner, chemical and thermal water treatment, pipelines, MaC, EMI, chimney, steam piping 32/21 bar, steam reduce station 32/21 bar, condensate piping, regenerating steam superheater -21 bar 480°C, wet washer
Complet overhoul steam boiler 25 t/h, 3,8 MPa, 440°C, changing a front wall, repair boiler tubes, burner changing
Supply and installation of the boiler SBK 14, saturated steam 14 t/h, 12 bar, gas low emmision burner Weishaupt with silencer, Eco with silencer, EMI, MaC, chimney, design project
Supply and installation of the boiler SKP 18 t/h, preheated steam 250 °C, 22 bar, gas burner Saacke, 2 blocks Eco, feed pump block, MaC, EMI, control system, project for building permit, design project
Producing and assembling of a pipe unit with an expander and a condensate tank
Supply and installation of the boiler SBK 8, saturated steam 8 t/h, Eco, gas low emmision burner Weishaupt, connection pipeline, M+C, EMI, project for building permit, design project
Supply of the boiler SBK 3, saturated steam 3 t/h, Eco, gas burner Weishaupt, feed water tank, commissioning
Supply and installation of the new boiler house incl. construstion of the boilerhouse with 2 boilers SBK 2, saturated steam, gas burners, Eco, chemical and thermal water treatment, M+C, EMI, control system, pipelines, chimneys, design project
Supply and installation of the accumulator 5 m3
Supply and installation of the new boiler SBK 6, saturated steam 6 t/h, 1,2 MPa, Eco, gas burner APH 45PZI, M+C, EMI, project for building permit, design project
Eco-friendly modification of the watertube boiler K5, preheted steam 25 t/h. Partly overhaul of the boiler pressure part - increasing of operating pressure, new preheater, modify of the evaporator, new condensator, new 2 blocks of, added exchanger flue gas/water for heating of manufacturing plant, burners for combined combustion of NG/bio gas
Supply and installation of the new boiler SBK 5, saturated steam 5 t/h, low emission gas burners Weishaupt,chemical and thermal water treatment, M+C, EMI, control system, design project
Reconstruction of the part T2 in production, reconstruction of the exchanger station for a object in the part T2 in production
Delivery of the ekonomiser for the boiler BK 2,5
Repair of the boiler for the steam locomotive 434.2338
Supply and installation of the water tube Economizers for two boilers BK 8
Supply and installation of the new boiler SBK 4, saturated steam 4 t/h, low emission gas burners Weishaupt. Reconstruction of chemical and thermal water treatment, M+C, EMI, control system, changing of pipelines in the area of customer, project for building permit, design project
Supply and installation of the new boiler room with boilwrs SBK 10 + SBK 6, 16 bar, saturated steam 6 and 10 t / h, low emission gas burners Weishaupt, chemical and thermal water treatment, M+C, EMI, control system, pipelines, chimneys
Complet overhaul of utilization boiler - changing of boiler tubes by change of drums distance
Replacing the steam boiler with a new one - SBK 6, preheated steam 220°C, 12 bar, Eco, gas low emmision burner Weishaupt, connection of the boiler to existing pipeline
Supply and installation of the new boiler SBK 8, saturated steam 8 t/h, 10 bar, gas low emmision burner APH 90 PZ, connection of the boiler to existing piping, chimney, project for building permit, design project. Modification of regulating gas station, supply of steam accumulator incl. mounting
Supply and installation of the new boiler SBK 6, saturated steam 6 t/h, 12 bar, gas low emmision burner Weishaupt, connection of the boiler to existing piping, chimney, project for building permit, design project
Reconstruction of a oil steam boiler house with the boiler SBK1,5, 1,5 t / h, saturated steam, 0,4 MPa, oil burner Weishaupt, chemical and thermal water treatment, oil supply pipeline, exhaust gas duct, MaC. Block arrangement of the boiler room
Supply and installation of the boiler SBK 5, superheated steam 220°C, 10 bar, Eco, steam preheater, gas low emmision burner, MaC, EMI, chimney, control system, design project , project for building permit, design project
Supply and installation of a new boiler SBK 1 with Eco and gas low emmision burner Weishaupt, chemical and thermal water treatment, M+C, EMI, control system, pipelines, steam accumulator, gas connection, project for building permit, design project
Supply and installation of the two boiler SBK 8, saturated steam 8 t/h, gas low emmision burners Weishaupt, Eco, EMI, MaC, design project
Repairing of the steam boiler K4 - KTK 25 th, preheated steam 42 bar, 440 °C – repairing of the preheater, condenser and a pressure part of the boiler
Supply of replacement a steam source – the older steam boiler BK 6 t/h incl. gas burner
Supply and mounting of steam pipelines
Supply and installation of the 2 new boiler SBK 6, saturated steam 2x 6 t/h, gas burners, chemical water treatment, M+C, EMI, control system, pipelines, chimneys, design project
Complet overhaul onepass firetube utilization boiler
Conversion of a 6 steam boiler BK6 to hot water mode, partly changing of the burners
Supply of the water tube boiler SKP 12, preheated steam 12 t/h, 12 bar
Complet overhaul of utilization boiler, supply of feed water tank
Supply and installation of the boiler house with the boiler SBK 12, satureted steam 12 t/h, 10 bar, Eco, stainless water heater for additional water, low emmission burner Weishaupt, gas reducing station, steam accumulator 20 m3, chemical water treatment with mechanical filtration and reverse osmosis, thermal water treatment, feed water tank 20 m3 with built-in steam exchanger for additional water, pipeline, connection of autoclaves, control system, MaC, EMI, project for building permit, design project
Supply of the boiler BK 2,5, ekonomizer, the burner, BOSB
Delivery and installation of the flue gas heat exchanger to the waste incinerator
Repair of the boiler for locomotive 477.043 (Lužná u Rakovníka), 534.0323 (Lužná u Rakovníka), 534.0432 (Olomouc), 354.195 (Lužná u Rakovníka), 434.1100 (NTM Praha), 434.2186, 556.0506
SEA CZ, a.s.
sídlo:
Zabrání 1116,
763 01 Zlín - Malenovice
tel: 577 101 085
seacz-zl@seacz.cz
pobočka:
Tyršova 469,
280 00 Kolín 2
tel: 321 729 249
seacz-kol@seacz.cz
SEA Kolín s.r.o.
Tyršova 469
280 00 - Kolín 2
tel: 321 729 249
seakolin@seakolin.cz
SEA Zlín s.r.o.
Zabrání 1116,
763 02 Zlín - Malenovice
tel: 577 101 085
seazlin@seazlin.cz